Bulk earthworks volumes at tender stage
As part of your tender submissions we can calculate your site bulk earthworks quantities. This can also be used as a check on supplied quatities as a means of gaining a competitive advantage over your competition.
Capping and sub-base requirements
As a process included within the bulk earthworks volumes we can calculate your aggregate requirements. Used alongside the phasing option deliveries can be scheduled accordingly helping Project cashflow.
Areas of hard material such as tarmac and concrete
Also as part of the bulk earthworks calculation we would estimate the amount of recycleable material won on site. This assessment can be used to decide is on site crushing is a financially viable option and the effect it would have on aggregate deliveries and costs.
Volume and area of regulating required to tarmac on projects
On highway Projects we are able to calculate the overlay areas and regulating requirements. Doing this allows tighter control of surfacing subcontractors on site and more accurate surfacing prices at tender stage
Volumes and areas of stabilisation requirements
If yourProject is being stabilised volumes and area can be calculated prior to commencement. Once again this provides tighter sub-contractor control.
Volumes of various strata found during site investigation
The different types of material on site can make a large difference in your earthworks costs. Whether this is through disposal costs or treatment costs. using the site borehole logs we can profile each different strata and provide quantities of what you will find once excavation begins, providing you with a more accurate up front budget.
Cut fill balance calculations for muck away reductions
The most effective method to reduce earthworks costs is to eliminate disposal from site. Working alongside the design team we can manage the site levels to reduce this as much as possible and in many cases eliminate muck away completely.
Earthworks usage and phasing volumes for programming purposes
Working alongside the planning team we can breakdown the cut fill into your phasing requirements. This provides a very accurate picture of the earthworks operation in its component parts.